Search for your permit
Search returned 92 results
-
Small Pond Approval for State and Federal Applicants
Stormwater, Dam Safety, and Flood Management Program
Combined plan approval of stormwater management and sediment control for State/federal agencies engaging in earth disturbing activities.
Processing Time: 3 - 9 MonthsExpected Fee: $0 -
Special Medical Waste Hauler & Vehicle Certification
Solid Waste Program
Any hauler who picks up or drops off Special Medical Waste in Maryland must be certified as a MD Hauler and each vehicle must be certified.
Processing Time: 60 DaysExpected Fee: $50 (per vehicle) -
Stormwater Management and Sediment & Erosion Control Approval
Stormwater, Dam Safety, and Flood Management Program
Stormwater Management and Sediment & Erosion Control Approval ensures that land development and construction activities are planned and implemented to minimize runoff, erosion, and sediment pollution. The program reviews and approves plans to control stormwater, prevent soil loss, and protect waterways, helping maintain natural hydrologic conditions and comply with Maryland environmental regulations.
Processing Time: 3 - 9 MonthsExpected Fee: $0 -
Surface Coal Mining Blaster Certification
Mining Program - Bureau of Mines - Coal Division
All individuals conducting blasting on surface coal mining operations are required to obtain a blasters certification. Additionally, all blasters must also be licensed by the Maryland State Fire Marshal's Office. A certification must be renewed every three (3) years.
Processing Time: 30 DaysExpected Fee: $0 -
Voluntary Cleanup Program Application
Land Restoration Program
The Voluntary Cleanup Program is designed to facilitate the cleanup and redevelopment of eligible properties that may be contaminated with hazardous substances or oil. The application process involves submitting detailed information about the property, its environmental conditions, and the applicants interest in the property.
Processing Time: 60 DaysExpected Fee: $10,000 (for initial applications) -
Water and/or Sewerage Construction Permit
Engineering and Capital Projects Program
Construction permit for major water and sewer projects
Processing Time: 90 DaysExpected Fee: $0 - $2,000 -
Water Appropriation and Use Permit (<10,000 gallons)
Water Appropriation and Use Permit Program
This permit is required for any activity that withdraws water from the State's surface water and/or groundwater, unless exempted.
Processing Time: 1to 18 MonthsExpected Fee: $0 -
Waterworks and Waste Systems Operator Certification
Maryland Board of Waterworks and Waste Systems Operators
Licensure / certification is required of any person operating a water or wastewater plant in the state of Maryland
Processing Time: 60 DaysExpected Fee: $50 -
Well Driller License (New)
Maryland Board of Well Drillers
Licensure/certification is required for any person explore for groundwater, obtain or monitor ground water, inject water into any underground formation from which water may be produced, transfer heat to or from the ground or groundwater, install well pumps and water conditioning equipment.
Processing Time: 30 - 60 DaysExpected Fee: $50 - $175 -
Well Driller License (Renewal)
Maryland Board of Well Drillers
Licensure/certification is required for any person explore for groundwater, obtain or monitor ground water, inject water into any underground formation from which water may be produced, transfer heat to or from the ground or groundwater, install well pumps and water conditioning equipment.
Processing Time: 1 DayExpected Fee: $100 - $200
Having technical issues? Please contact us at [email protected]
Session Expiring
Your session will expire in