Search for your permit

Search returned 92 results

  • Small Pond Approval for State and Federal Applicants

    Stormwater, Dam Safety, and Flood Management Program

    Combined plan approval of stormwater management and sediment control for State/federal agencies engaging in earth disturbing activities.

    Processing Time: 3 - 9 Months
    Expected Fee: $0
  • Special Medical Waste Hauler & Vehicle Certification

    Solid Waste Program

    Any hauler who picks up or drops off Special Medical Waste in Maryland must be certified as a MD Hauler and each vehicle must be certified.

    Processing Time: 60 Days
    Expected Fee: $50 (per vehicle)
  • Stormwater Management and Sediment & Erosion Control Approval

    Stormwater, Dam Safety, and Flood Management Program

    Stormwater Management and Sediment & Erosion Control Approval ensures that land development and construction activities are planned and implemented to minimize runoff, erosion, and sediment pollution. The program reviews and approves plans to control stormwater, prevent soil loss, and protect waterways, helping maintain natural hydrologic conditions and comply with Maryland environmental regulations.

    Processing Time: 3 - 9 Months
    Expected Fee: $0
  • Surface Coal Mining Blaster Certification

    Mining Program - Bureau of Mines - Coal Division

    All individuals conducting blasting on surface coal mining operations are required to obtain a blasters certification. Additionally, all blasters must also be licensed by the Maryland State Fire Marshal's Office. A certification must be renewed every three (3) years.

    Processing Time: 30 Days
    Expected Fee: $0
  • Voluntary Cleanup Program Application

    Land Restoration Program

    The Voluntary Cleanup Program is designed to facilitate the cleanup and redevelopment of eligible properties that may be contaminated with hazardous substances or oil. The application process involves submitting detailed information about the property, its environmental conditions, and the applicants interest in the property.

    Processing Time: 60 Days
    Expected Fee: $10,000 (for initial applications)
  • Water and/or Sewerage Construction Permit

    Engineering and Capital Projects Program

    Construction permit for major water and sewer projects

    Processing Time: 90 Days
    Expected Fee: $0 - $2,000
  • Water Appropriation and Use Permit (<10,000 gallons)

    Water Appropriation and Use Permit Program

    This permit is required for any activity that withdraws water from the State's surface water and/or groundwater, unless exempted.

    Processing Time: 1to 18 Months
    Expected Fee: $0
  • Waterworks and Waste Systems Operator Certification

    Maryland Board of Waterworks and Waste Systems Operators

    Licensure / certification is required of any person operating a water or wastewater plant in the state of Maryland

    Processing Time: 60 Days
    Expected Fee: $50
  • Well Driller License (New)

    Maryland Board of Well Drillers

    Licensure/certification is required for any person explore for groundwater, obtain or monitor ground water, inject water into any underground formation from which water may be produced, transfer heat to or from the ground or groundwater, install well pumps and water conditioning equipment.

    Processing Time: 30 - 60 Days
    Expected Fee: $50 - $175
  • Well Driller License (Renewal)

    Maryland Board of Well Drillers

    Licensure/certification is required for any person explore for groundwater, obtain or monitor ground water, inject water into any underground formation from which water may be produced, transfer heat to or from the ground or groundwater, install well pumps and water conditioning equipment.

    Processing Time: 1 Day
    Expected Fee: $100 - $200

Having technical issues? Please contact us at [email protected]

Session Expiring

Your session will expire in